Answers are grounded in this paper and cite their sources.
This study addresses an off-site construction (OSC) task: installing heavy prefabricated equipment modules at elevated positions inside existing structures. The task simultaneously demands multi-ton payload capacity, a lift height approaching 10 m, and holonomic maneuvering in narrow aisles; to the authors’ knowledge, no single reported platform satisfies all three. We present a heavy-duty, high-lift mobile robot that lifts 6 t to 8 m. Two active swerve-drive modules and three passive casters form a five-point asymmetric layout combining holonomic mobility with load distribution, and the lift unit functionally decouples the vertical stroke (four helical band actuators) from the lateral stiffness (four scissor-stabilizing mechanisms). Planar motion is partitioned into three driving modes with closed-form forward and inverse kinematics, and zero-velocity transitions remove the kinematic model mismatch and the instantaneous-center-of-rotation discontinuity of a single unified model. Prototype measurements confirmed the motor-sizing torque assumptions, and chassis finite element analysis showed a factor of safety above 2.0 under maximum payload and quantified the in-plane stress induced by kinematic mismatch. In two field deployments, the robot reduced personnel by 25.0–27.3%, equipment by 42.9–60.0%, and installation duration by 50.0–85.7% relative to the incumbent methods, thereby extending mobile robots from horizontal transport to vertical OSC module installation.
No takes yet. Share an insight, caveat, or question.
Kim et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: