Answers are grounded in this paper and cite their sources.
Considerable attention has been given to the role of strategic environmental assessment (SEA) in policy, plan and program assessment; however, there is very little consensus on an appropriate methodology for SEA. Two basic perspectives on SEA methodology emerge from the literature: first, that appropriate SEA methodologies are readily available based on the application of project-level EIA approaches to strategic assessment questions and second, that SEA requires a different, more broad-brush approach than project-level EIA. If SEA is to advance in application and effectiveness, then appropriate SEA methodologies need to be established. Despite calls for SEA to develop more independently of project-level assessment, existing SEA methodologies tend to be based on project-level EIA principles. It is argued here that while SEA can perhaps utilise many of the existing methods from project-level EIA, it requires a different, more broad-brush, but structured methodological approach. This paper reviews the current state-of-the-art of SEA methodology, and presents a generic SEA methodological framework and example based on the notion of the "best practicable environmental option".
No takes yet. Share an insight, caveat, or question.
Noble et al. (2001) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: