The effectiveness and advancement of construction projects are significantly influenced by labor and equipment productivity. However, poor monitoring of productivity levels often leads to delays and schedule violations. This study uses a work sampling approach in an Indonesian market development project to assess labor and heavy equipment productivity in ground floor slab construction. The study used project documentation such as timetables, quantity plans, and equipment records to support the research, which was carried out through direct field observations that documented worker behaviors at random intervals. Key construction tasks like earth fill, sand fill, reinforcement, and concrete casting are the focus of the investigation. With earth fill reaching 35.54 m³/day, sand fill 14.06 m³/day, reinforcement 864.69 kg/day, and concrete casting 8.11 m³/day, the data demonstrate that worker productivity varies between operations. Meanwhile, equipment productivity was 0.135 m³/minute for mixer trucks and 0.4957 m³/minute for excavators. The work sample results reveal inefficiencies brought on by unprepared site conditions and overlapping task sequences by showing discrepancies between planned and observed output. The production level is deemed sufficient overall, but to minimize deviations, better planning and site preparation are required. This study shows that work sampling is a useful and trustworthy method for tracking construction productivity and spotting performance gaps under actual project circumstances.
No takes yet. Share an insight, caveat, or question.
Silalahi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: