With the continuous expansion of grid-connected variable renewable energy such as wind power and photovoltaic power, sharp short-term fluctuations in system net load have intensified, posing challenges to conventional energy market dispatch in ramping resource allocation. However, existing ramping market clearing studies still lack an in-depth treatment of how large-capacity, long-duration storage resources such as pumped-storage hydropower participate in the ramping market, and they tend to oversimplify net-load forecast uncertainty. To address this, this paper proposes a joint clearing method for pumped-storage hydropower participating in both the electric energy and ramping markets while accounting for net-load forecast errors. First, a non-parametric kernel density estimation approach models the probability distribution of forecast errors, decomposing ramping demand into a forecast fluctuation component and an uncertainty margin component at a given confidence level. Second, a refined pumped-storage hydropower operational model is established considering state transition and upper reservoir constraints. On this basis, a joint electricity ramping clearing model is built integrating thermal units, pumped-storage hydropower, demand response, and renewable curtailment, aiming to minimise total operating cost. A case study on a Chinese provincial power grid shows that accounting for forecast errors raises the renewable integration rate from 91.4% to 93.2%, and pumped-storage hydropower participation further lifts it to 94.7% while cutting total operating cost by 5.552 million yuan.
No takes yet. Share an insight, caveat, or question.
Teng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: