Answers are grounded in this paper and cite their sources.
Due to the shortage of the Tc generator in Japan, the production of 99Mo/Tc generator using thermal neutrons at Japan Research Reactor-3 (JRR-3) is being planned. Establishing a seamless supply network during the long shutdown of JRR-3 is essential. Thus, we conducted a conceptual study to estimate the 99Mo production yield via the 100Mo(p,X) reaction using a 0.4-GeV proton beam at a new facility of Japan Proton Accelerator Research Complex (J-PARC). We measured the Mo(p,X) cross sections at proton incident energies of 0.4, 2.2, and 3.0 GeV at J-PARC. The 100Mo(p,X)99Mo cross section at 0.4 GeV was derived from the measured Mo(p,X)99Mo cross section at J-PARC to identify suitable nuclear reaction models for the 99Mo yield estimation. Using the selected model, the 99Mo yield at the new facility is estimated to be 29.6 TBq/month, which is comparable to the yield at JRR-3. Thus, we conclude that the new facility using the 100Mo(p,X) reaction is effective in covering the supply during the long shutdown of JRR-3.
No takes yet. Share an insight, caveat, or question.
Sugihara et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: