Construction work involves diverse hazards, so risk has to be assessed systematically before controls are selected. This study determines the risk level of each potential hazard in the XYZ construction project in Surabaya using the Hazard Identification, Risk Assessment and Risk Control (HIRARC) method and proposes controls for the priority hazards. Hazards were identified in 15 work items using four indicators: workers, equipment, materials and environment/public. Probability (P) and impact (I) were rated on a 1–5 Likert scale by seven contractor respondents selected by purposive sampling, averaged, and multiplied to obtain the risk value (R = P × I). The study identified 29 potential hazards with R values of 4.29–7.84 (mean 5.53): 11 hazards (37.93%) were low risk, 18 (62.07%) were medium risk and none was high risk. The highest risk was a girder falling during lifting and erection (R = 7.84), followed by unguarded grinders (7.04) and dust and project vehicle traffic during backfilling (6.98). Nine hazards with R ≥ 6.0 were designated priority risks, four of them related to vehicle movement. Controls for these hazards were formulated following the hierarchy of control (engineering, administrative and personal protective equipment), including a lifting plan with exclusion zones for girder erection, a traffic management plan separating vehicles from workers and the public, and machine guarding for cutting tools. The environment/public indicator had the highest mean risk (6.17), and the superstructure group had the largest share of medium-risk hazards (7 of 9). The results rest on respondents' perception and the proposed controls are not yet validated, so they should be complemented by field observation.
No takes yet. Share an insight, caveat, or question.
Damara et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: