Answers are grounded in this paper and cite their sources.
Data-driven monitoring and optimization require execution-time records that many labor-intensive offsite plants lack, because their records mark completions without timestamps. This study designs, implements and verifies a data-integration layer for a three-line bathroom-module factory. Operators declare task starts and finishes on tablets, and each declaration is reconciled into explicit time magnitudes and labeled by origin and evidence tier before reaching line balancing, discrete-event simulation and backward scheduling. The architecture operates as an operator-mediated digital shadow: the physical-to-digital flow is automated once an operator declares an event, and every proposal returned to the plant requires authorization by the production manager. As raw production records could not be released, the system was exercised on 1880 prototype task durations transformed from plant measurements and on 50,630 generated observations. Reconciliation exposed overstatements of 7 to 18 min that adding concurrent task durations would cause at three stations. The simulation engine matched an analytical bound exactly in eight typologies and within 0.4% in seven project mixes. The balancing module recovered a deliberately built opportunity, lowering the modeled bottleneck from 80 to 65 min in three typologies under the adopted station-load convention, a reduction that falls to 1 min in the typology examined if no task overlap is assumed. In a stress scenario, the scheduler flagged 804 of 1815 units as infeasible. These results verify functional behavior on selected scenarios, not operational performance in the plant. The layer makes data sufficiency explicit and prepares statistical monitoring once measured samples accumulate.
No takes yet. Share an insight, caveat, or question.
Cerezo-Narváez et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: