This is the authors' abstract. We don't add key points for this paper.
The fast deployment of renewable energy in Italy by 2030, according to the National Energy and Climate Plan, will lead to renewable electricity surplus mainly in Southern Italy where adequate energy storage is not currently available. In this paper, a Power to Green Hydrogen followed by a methanation process is proposed to accelerate decarbonisation and the integration of higher shares of variable renewable energies in Southern Italy. Green hydrogen can be injected directly into the natural gas grid or used to produce biomethane that can be injected afterwards into the natural gas grid. The main results of our assessment are: 1) 819 – 1,638 Mm3 green hydrogen that could be produced by water electrolysis using the renewable electricity surplus; 2) 160 Mm3 biomethane produced through biogas upgrading and and 3) 14 – 117 Mm3 additional biomethane produced through methanation by using biogenic carbon dioxide from biogas upgrading. The approach would enable a) green hydrogen production cost competitive with grey hydrogen (44 €/MWh) only when the electrolysis system uses electricity for free and its load factor is above 1,800 h/y and 5,000 h/y for the optimistic and conservative case, respectively; b) biomethane production cost via biogas upgrading (about 58 €2020/MWh); and c) biomethane production cost via methanation competitive versus natural gas price (30 €/MWh) only when using electricity for free and operates at full load for over 5,400 h/y in the optimistic case.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Giocoli et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: