Answers are grounded in this paper and cite their sources.
In this study, a discrete-event simulation model was developed to simulate raw-ore haulage in an open-pit limestone mine using ICT monitoring data and time-study measurements.The haulage cycle comprises empty travel, loading, loaded travel, dumping at the hopper, and waiting for equipment.Because ICT logs do not explicitly distinguish between individual haulage-cycle components, loading, and dumping times, the ratio of empty to loaded travel time was supplemented using time-study measurements.In contrast, truck cycle times and haulage distances were derived from field records.The model was validated against field haulage records collected on April 5, 2023, and July 18, 2024; the error rates for the total transported ore were 4.95% and 1.39%, respectively, and the simulated haul counts by truck showed trends comparable to the field records.Equipment combination scenarios further demonstrated the model's applicability in evaluating the effects of truck and loader types and fleet size on haulage performance. Key words :
No takes yet. Share an insight, caveat, or question.
Jung et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: