Answers are grounded in this paper and cite their sources.
Traffic congestion and travel time uncertainties along the Lagos-Benin Expressway segment from Oluku Terminal to Five Junction in Benin City, Nigeria, have been of great concern to road users over the years. Therefore, the objective of this paper was to investigate travel time and delay on the Oluku Terminal to Five junction along the Lagos-Benin Expressway segment in Benin City, Nigeria, using standard techniques, including traffic volume study, spot speed study, and travel time and delay study, were conducted. Data obtained show peak hour periods of 8 am – 10 am and 5 pm – 6 pm for all selected road locations, coinciding with commuting hours. Over 80% of traffic consists of passenger cars and mini/small buses, indicating that the route is a major expressway for commuters’ day-to-day activities. The average operating speed along the 100m road falls within 51km/hr. – 61km/hr. which aligns with the design speed of the road. The average delay is 9 minutes, which is 45% of the actual travel time (20mins) and 60% of the ideal travel time (15 minutes). Delays stem from multiple factors such as driver behavior, breakdowns, accidents, road characteristics, and pavement conditions. This study provides actionable insights for minimizing congestion, improving daily commutes, and reducing environmental impact, with implications for infrastructure planning and urban sustainability. The insights gained can inform urban planners, traffic engineers, and decision-makers in future urban development.
No takes yet. Share an insight, caveat, or question.
Ogbeifun et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: