Answers are grounded in this paper and cite their sources.
Production line vulnerability is jointly influenced by equipment degradation, node coupling, and material flow blocking. Existing methods do not adequately capture the relationships among state changes, disturbance propagation, and material flow constraints. This study proposes an assessment method that combines the Integrated Bottleneck Index (IBI) with a dynamic Bayesian network (DBN)–NK model. A multistate Markov process describes node degradation and repair, and a coupling matrix quantifies disturbance propagation between nodes. The IBI is formulated as a weighted combination of disturbance sensitivity and blocking degree and incorporated into the assessment of node and system vulnerability. A FlexSim model comprising one main production line and five auxiliary lines is used to identify critical nodes and examine buffer effects. Under the specified topology and parameters, system vulnerability is generally lower with finite buffers of 30 workpieces than with zero buffers. Under joint input perturbations of ±20%, the median Spearman rank correlation coefficient for the IBI ranking is 0.948, and the mean overlap of the top five nodes is 94.40%. These results indicate stable identification of the most critical nodes within the prescribed perturbation range. By jointly accounting for node states, disturbance propagation, and material flow constraints, the method provides a quantitative basis for critical node identification, maintenance prioritization, and buffer allocation.
No takes yet. Share an insight, caveat, or question.
Gu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: