Synapse

← International Journal of Mining Reclamation and Environment

Papers in International Journal of Mining Reclamation and Environment

Page 1 · newest first

  1. Stewardship beyond closure: interpretive continuity and adaptive observation in long-lived tailings facilitiesInternational Journal of Mining Reclamation and Environment · 2026
  2. Low-carbon haulage alternatives for future net-zero surface mines: a systematic review of energy assessment methods and decision frameworksInternational Journal of Mining Reclamation and Environment · 2026
  3. Operational cycle detection in underground haul trucks via data-driven hydraulic pressure reconstruction based on on-board SCADA dataInternational Journal of Mining Reclamation and Environment · 2026
  4. Discrete element analysis of crack propagation, energy evolution, and failure mechanisms of red sandstone under pulsating loadingInternational Journal of Mining Reclamation and Environment · 2026
  5. Coordinated production and charging strategies for battery-electric load-haul-dump fleets in underground miningInternational Journal of Mining Reclamation and Environment · 2026
  6. Rainfall infiltration-induced vertical differentiation of pore structure and permeability in mine tailings: a throat-dominated mechanismInternational Journal of Mining Reclamation and Environment · 2026
  7. Multi-source heterogeneous data‑driven strength forecasting of cement-based paste backfill using missing-data imputation and MiceForest–Bayes–XGBoost modelingInternational Journal of Mining Reclamation and Environment · 2026
  8. Improved Gaussian process regression for rock slope displacement monitoring and early warningInternational Journal of Mining Reclamation and Environment · 2026
  9. Strength and deformation characteristics of rock-backfill-rock composites under uniaxial compression: experiments and three-dimensional modelsInternational Journal of Mining Reclamation and Environment · 2026
  10. Study on the wing crack propagation behaviour of defective medium under delay blastingInternational Journal of Mining Reclamation and Environment · 2026
  11. Estimation and performance optimisation of blasting-induced ground vibration using LSO-RF, APO-RF, and PO-RF modelsInternational Journal of Mining Reclamation and Environment · 2026
  12. Fresh properties of cemented paste backfill with slag activated by a blend of sodium carbonate and sodium hydroxideInternational Journal of Mining Reclamation and Environment · 2026
  13. Mitigating geohazards in underground goafs: a review of detection technologies, risk assessment, and treatment methodsInternational Journal of Mining Reclamation and Environment · 2026
  14. A case study on the performance analysis of loading, hauling, and unloading operations in a chilean open pit copper mine through process miningInternational Journal of Mining Reclamation and Environment · 2026
  15. Incorporating grade uncertainty and stockpiling in stochastic open stope production scheduling optimizationInternational Journal of Mining Reclamation and Environment · 2026
  16. Mining equipment maintenance and reliability: a systematic review of modelling approaches, solution methods, and applicationsInternational Journal of Mining Reclamation and Environment · 2026
  17. Simultaneous stochastic optimisation of mining complexes: integrating waste management and progressive reclamation with encapsulationInternational Journal of Mining Reclamation and Environment · 2026
  18. Analysis of current research trends in the reclamation of post-mining areas in open pit mining – a review of literature from 2000 to 2024International Journal of Mining Reclamation and Environment · 2026
  19. A hybrid MINLP and two-layer reinforcement learning framework for real-time fleet optimisation in open-pit miningInternational Journal of Mining Reclamation and Environment · 2026
  20. CO ₂ absorption saturation threshold in carbonated coal-based solid waste backfill materialsInternational Journal of Mining Reclamation and Environment · 2026
  21. Exploring hyperspectral imaging and regression-based analysis as an alternative to MLA for mineral compositionInternational Journal of Mining Reclamation and Environment · 2026
  22. Automatic blasthole positioning for face drilling rigs in underground mines: a LiDAR-SLAM-based blasthole pattern plan fitting approachInternational Journal of Mining Reclamation and Environment · 2026
  23. Data-driven optimisation of crushing system configuration in large-scale copper mines to reduce CO ₂ emissionsInternational Journal of Mining Reclamation and Environment · 2026
  24. Machine learning approaches for overbreak and underbreak prediction in underground mining: a literature reviewInternational Journal of Mining Reclamation and Environment · 2026
  25. Joint fleet management and stochastic short-term production planning in mining complexes with carbon footprint reductionInternational Journal of Mining Reclamation and Environment · 2026
  26. Decision-making for dust suppressant selection in mining roads: a comparative study using FAHP and PROMETHEE IIInternational Journal of Mining Reclamation and Environment · 2026
  27. Mining operation decision support: intelligent truck scheduling for open-pit mines with modelling and optimization collaborationInternational Journal of Mining Reclamation and Environment · 2026
  28. Optimisation strategy for multi-branch joint on-demand regulation of complex mine ventilation networks based on ε -CSO algorithm and sensitivity theoryInternational Journal of Mining Reclamation and Environment · 2026
  29. Holistic insights into uncertainty-based modeling approaches for open pit mine planningInternational Journal of Mining Reclamation and Environment · 2026
  30. Coupled thermochemical effects on mode II fracture toughness of waste-based cemented paste backfill with/without superplasticizerInternational Journal of Mining Reclamation and Environment · 2026
  31. Integrating cutting-edge technologies in smart mining across the value chain: a comprehensive state of the artInternational Journal of Mining Reclamation and Environment · 2025
  32. Hybrid machine learning and factor-based simulation for geostatistical modelling of residual resources in a tailings storage facilityInternational Journal of Mining Reclamation and Environment · 2025
  33. Short-term planning optimisation of open pit mines with Monte-Carlo haulage simulation in presence of semi-mobile IPCCInternational Journal of Mining Reclamation and Environment · 2025
  34. Influence of climate and deposition parameters on acid mine drainage risks from filtered tailings facilitiesInternational Journal of Mining Reclamation and Environment · 2025
  35. Effect of delay timing on dynamic fracture behaviour of rock: numerical and experimental approachesInternational Journal of Mining Reclamation and Environment · 2025
  36. An innovative lightweight model for electric shovel bucket tooth status detection in open-pit minesInternational Journal of Mining Reclamation and Environment · 2025
  37. Coordination of electrical drilling machines in open-pit mines: a constraint programming approachInternational Journal of Mining Reclamation and Environment · 2025
  38. Improving PPV prediction in open-pit blasting through Cubist-based feature enrichment and machine learning modelsInternational Journal of Mining Reclamation and Environment · 2025
  39. Draw sequence selection under lateral migration in block/panel caving miningInternational Journal of Mining Reclamation and Environment · 2025
  40. A novel strategic planning and sequencing optimisation model for Fully Mobile In-Pit Crusher Conveyor (FMIPCC) systemsInternational Journal of Mining Reclamation and Environment · 2025
  41. A proposal of quantitative indicators to evaluate the corporate social responsibility contribution to Sustainable Development Goals accomplishment in the mining sectorInternational Journal of Mining Reclamation and Environment · 2025
  42. Genetic algorithm optimisation of open pit mine production scheduling considering social effectsInternational Journal of Mining Reclamation and Environment · 2025
  43. Geological characterisation methods for IOCG samples, resolution comparison and considerations for productive stages of miningInternational Journal of Mining Reclamation and Environment · 2025
  44. KMeans-Riemannian model for classification mineral resources in a copper deposit in PeruInternational Journal of Mining Reclamation and Environment · 2025
  45. Optimising an iron ore mining value chain under geological uncertaintyInternational Journal of Mining Reclamation and Environment · 2025
  46. Optimising bench-level energy distribution based on drilling error measurements in the mining industryInternational Journal of Mining Reclamation and Environment · 2025
  47. Comparison of cycle times for manual and semi-autonomous load haul dump (LHD) machines: an operational perspective at LKAB’s Kiirunavaara MineInternational Journal of Mining Reclamation and Environment · 2025
  48. Dynamic weighting and genetic algorithm-based hybrid SVR-Ridge model for improving PM 2.5 forecasting in open-pit copper minesInternational Journal of Mining Reclamation and Environment · 2025
  49. Strategic adaptations of infrastructure/facilities in an operating mining complex under geological uncertaintyInternational Journal of Mining Reclamation and Environment · 2025
  50. Learning-based dispatching system with trajectory optimisation for autonomous mining transportationInternational Journal of Mining Reclamation and Environment · 2025