Answers are grounded in this paper and cite their sources.
: The research employs the Quantile Mapping (QM) post-processing method to improve the skill forecasts of the deterministic forecast of the European Centre for Medium-Range Weather Forecasts (ECMWF) Integrated Forecasting System (IFS). The selected research areais Central Vietnam, and the analysis utilizes observation data from 41 stations and 10-year ECMWF-IFS data from 2013 to 2022, with a lead time of up to 10 days for the QM applications. The findings indicate that the QM facilitates enhanced forecasting skills in the IFS model for all lead times up to 10 days, exhibiting varying magnitudes based on the specific lead time and rainfall thresholds. Notably, the impact of QM is found to be negligible for heavy rainfall events, with the skill limit being determined as insignificant for lead times up to 72 hours in summer and 144 hours in winter
No takes yet. Share an insight, caveat, or question.
Dang et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: